PDA

View Full Version : spinning assembly done.


threestar40
09-25-2005, 06:37 PM
Got the bottom end put together today...everything went perfectly.

Lunati Promod 6.125" rods.
JE pistons with floating pins retained by wire locks.
Eagle 4340 non-twist crank (very nice piece by the way).

Speed Pro rings .018 on the top ring .012 on the bottom.

I probably should have gone about .002 more on each ring, but I didn't.

I'm betting the motor it will be Ok. :_paranoid

Here was the scene in my life today:http://threestar40.home.mindspring.com/spinningassembly%20001.jpg

http://threestar40.home.mindspring.com/spinningassembly%20004.jpg

Tomorrow, more progress.

Rick :lateral:

slow4dr
09-26-2005, 02:28 PM
Got the bottom end put together today...everything went perfectly.

Lunati Promod 6.125" rods.
JE pistons with floating pins retained by wire locks.
Eagle 4340 non-twist crank (very nice piece by the way).

Speed Pro rings .018 on the top ring .012 on the bottom.

I probably should have gone about .002 more on each ring, but I didn't.

I'm betting the motor it will be Ok.

Here was the scene in my life today
Tomorrow, more progress.

Rick :lateral:


:thumbsup: Thanks for the update Rick!

:yes:

XcYZ
09-26-2005, 06:05 PM
Progress. :thumbsup:

lil427z
09-26-2005, 09:14 PM
rick .keep up the good work . :thumbsup:
rick kirkindall

hotwheels
10-23-2005, 11:30 AM
that look's awesome.........