...

Go Back   Lateral-g Forums > Technical Discussions > Paint and Body
User Name
Password



Reply
 
Thread Tools Display Modes
  #1  
Old 03-18-2014, 08:36 PM
Thenovaguy's Avatar
Thenovaguy Thenovaguy is offline
Junior Member
 
Join Date: Dec 2010
Posts: 14
Thanks: 0
Thanked 0 Times in 0 Posts
Default 66 chevelle floor replacement?

I'm looking to replace the floors,floor braces and inner rockers on a 66 Chevelle. Since I don't possess the skills and knowledge to do it myself I'm checking out local shops. So I'm wondering how many hours it would take to replace. I got one quote of between 80-120 hours. Does that sound right? Most shops wont give a rough idea and say they just work at the shop rate. I have never done such a job but I would assume it's time and labor intensive due to having to separate the frame from the body to access the inner rockers. I would appreciate any guidance on what a realistic number would be.

Thanks

T.J.
Reply With Quote
  #2  
Old 03-19-2014, 12:34 AM
Vince@Meanstreets's Avatar
Vince@Meanstreets Vince@Meanstreets is offline
Senior Member
 
Join Date: Nov 2004
Location: Bay Area, California
Posts: 5,532
Thanks: 13
Thanked 18 Times in 12 Posts
Default

Quote:
Originally Posted by Thenovaguy View Post
I'm looking to replace the floors,floor braces and inner rockers on a 66 Chevelle. Since I don't possess the skills and knowledge to do it myself I'm checking out local shops. So I'm wondering how many hours it would take to replace. I got one quote of between 80-120 hours. Does that sound right? Most shops wont give a rough idea and say they just work at the shop rate. I have never done such a job but I would assume it's time and labor intensive due to having to separate the frame from the body to access the inner rockers. I would appreciate any guidance on what a realistic number would be.

Thanks

T.J.
80 is close with the inner rockers. The last floor I did we charged 55 hours and it included the trunk pan. I would do 75 hours with the inner rockers.
__________________
MEANSTREETS PERFORMANCE

Dealer for
ACCUAIR rideheight control systems
ENTROPY RADIATORS XXX radiators for your pro-touring vehicle
FORGELINE MOTORSPORTS Highline custom 3 piece wheels
WEGNER AUTOMOTIVE Custom engines and LSX drive systems
SPEEDTECH PERFORMANCE Bay Area stocking dealer

NEVER FORGET -11
Reply With Quote
  #3  
Old 03-19-2014, 06:01 PM
Thenovaguy's Avatar
Thenovaguy Thenovaguy is offline
Junior Member
 
Join Date: Dec 2010
Posts: 14
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Quote:
Originally Posted by Vince@MSperfab View Post
80 is close with the inner rockers. The last floor I did we charged 55 hours and it included the trunk pan. I would do 75 hours with the inner rockers.
Thank you Vince! I wasn't sure on what would be a fair estimate. My greatest fear is funding someone's learning curve and then hating myself for overpaying.



T.J.
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 12:24 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net