Making some more headway. The fuel tank is in and we started running the fuel line and power cables.
We also got the Holley alternator bracket installed along with the Turn One C5 pump. We ordered the correct belt today and hope to fire the engine tomorrow. With the Magnusun and alternator relocation it made the new belt run right through the power steering reservoir so we will need to space that out.
Tanks Inc tank is in.
Just another look at our part #4008 LSX motor mounts.
Holley alternator relocation bracket and Turn One C5 power steering pump.
Baer master cylinder installed. Clutch linkage still needs connected and worked on.