Still chipping away at the to do list. Got the floor cut fr subframe connectors, and mocked them in. Didn't get any further tonight because my welding cylinder is empty.
Here's how I have the car sitting with weight on the suspension. Motor is in for added weight too.
Floor pan cut for the pass through
Floor pan cut to expose the torque box so the connector can be welded to it.
Test fitting